GREGORY N. SMALLWOOD PE, PMP

SUMMARY:  Twenty three years of experience consulting, managing and engineering large oil and gas, control and instrument systems projects.  Experience is with all phases of EPC implementation and project management including project definition, project justification, estimating, systems design, equipment selection, instrument design, electrical design, systems engineering, programming, procurement, testing, installation, construction, training and commissioning.

·         Management and Sales experience includes P&L management, engineering management, business plan development, estimating and business start-ups and recoveries.

·         Industries include upstream offshore and onshore oil and gas (including LNG), refining, chemical, power, forest products, pharmaceutical and manufacturing.

 

CONTACT:   Singapore Mobile:  +65 81262279                 Home:  +1 (281) 557-3560    

USA Mobile:  +1 (832) 971-2323                    Email:  gsmallwood@mindspring.com

Kuala Lumpur Mobile: +60103676405

 

EXPERIENCE:

May 09 -         Lonestar Deepwater (Contract)

Present         Noble Energy FPSO Project Management Team, Houston, Kuala Lumpur, Singapore, Equatorial Guinea

Field owners representative, instrument & control systems lead for this SBM FPSO conversion.  The Aseng (Benita Field) FPSO will be a converted VLCC, which will begin operations in 1000 meters of water off the coast of Equatorial Guinea in late 2011.  Systems include the Process Control Systems, Safety Systems, Fire and Gas Systems, Vessel Systems and Sub-Sea Interfaces.  Platform statistics include 80,000 bopd production, 180 million scfd high CO2 gas reinjection, 80 bar HP separation and Water Injection.

 

June 07 -       Doris Inc. (Contract)

July 09           Murphy Azurite FDPSO Project Management Team, Singapore, Republic of Congo

Field owner’s representative, Instrument & Control Systems Lead and Commissioning Lead for this Singapore based FDPSO conversion.  The Azurite is a DNV Classed VLCC, which will began operations in 1400 meters of water off the coast of the Republic of Congo in April 2009.  Systems include the Process Control Systems, Safety Systems, Fire and Gas Systems, Vessel Systems and Sub-Sea and Drilling Interfaces.

 

January 07 - Emerson Process Management and Coogee Resources (Contract)

March 09       Project Manager and Instrument and Controls Consultant, Singapore, Brunei

Provided Project Management for petroleum offshore containerized equipment rooms (CER) for Brunei Shell Petroleum and provided Cause and Effect consulting services for the Tanker Pacific/Coogee Montara FPSO Project.  Cause and Effect consulting services included the Well Head Platform, Turret (APL), Subsea, Process and Marine Systems including PSD, ESD, and Fire & Gas Systems.

 

May 06 -         Alpha Petroleum Services (Contract)

Sept 07          AWE Umuroa FPSO Project Management Team, Singapore, New Zealand

Field owner’s representative, Instrument and Control Systems Lead for this Singapore based FPSO conversion.  Systems included the Process Control Systems, Safety Systems, Fire & Gas Systems, Vessel Management Systems and Sub-sea System Interfaces for the New Zealand Tui Field, Umuroa FPSO (730,000 barrel capacity).  The Umuroa is an ABS Classed Vessel with ABS certified topsides and began production 3rd Quarter 2007 off the coast of New Zealand in the Tui Field in 100 meters of water.  This converted Suezmax tanker capable of producing 50,000 bopd and 120,000 bpd of water processing and 25mmscfd of gas compression.  The ship included a gas/oil separation module, water treatment module, dehydration module, two gas lift compressors and a vapor recovery compressor, two gas/oil fired boilers, two turbo alternators and a flare module.  Oversight of all instrumentation and control system engineering, procurement, installation, commissioning and start-up.  Also included  were overview of the system architecture, communications, wiring, instrument and valve specification, P&ID development, Cause and Effect development and Commissioning and Test Plans.

 

2005 -             Houston Controls, Inc.

2009               Co-owner/Co-founder, Houston, TX

Houston Controls provides Instrument, Analyzer, Electrical, and Planning services to the Process Industries.

 

May 05 -         The Automation Group

May 06           Project Manager, Houston, TX

Responsible for the FEL definition and implementation of Safety Instrumented (IEC 61511 compliant) Systems and Distributed Control Systems for Lyondell Equistar.  Primary systems included Emerson DeltaV, Honeywell Experion and Invensys Triconex.  Managed estimating, engineering, design and implementation of multiple projects for Lyondell and approximately 20 engineers, designers and support personnel.  Projects included estimating, project planning, system definition, field survey, instrument and electrical specification, P&ID and cause and effect development and functional definition, instrument and electrical design, and implementation.

 

Dec 02 -         Contech Control Services

April 05          Manager, EPC Projects, La Porte, TX

Responsible for scoping, defining and management of turn-key EPC I&E projects for refining, petrochemical and oil and gas production.  Projects involved all elements of control system retrofits from instrument specification, electrical design, control system selection, control system configuration, construction, checkout and start-up.  Systems included Honeywell Experion, Emerson Delta V, Yokogowa CS 3000 and Siemens PCS 7.  Management of 27 engineering and 31 craft personnel for projects $100k to $5 million.  Clients included ExxonMobil, BP and Lyondell.

 

Jan 01 -         Maverick Technologies, Inc.

Dec 02           Sales Manager/Sr. Consultant, Houston, TX

Scoping and defining automation and electrical projects for a various industries including onshore/offshore oil and gas production, pipelines, refining, chemical, food, pharmaceutical and power.  Projects include green field, retrofits, upgrades and higher level connectivity; and Honeywell, Emerson, Invensys, Yokogawa and Siemens DCS systems and PLC’s.

 

July 00 -        Aspen Technology, Inc.

Jan 01            Sr. Project Manager, Newark, DE

Responsible for the implementation of a $20 million Integrated Demand and Supply Planning (supply chain) project for 10 chemical business units within BP.  Lead a team of 40+ business consultants in Chicago and London on the application of the three major modules (demand forecasting, supply demand balancing and scheduling) of Aspentech’s MIMI Supply Chain Software product.  Project included work at 80 plants primarily in North America, Europe and Asia.

 

Nov 97-          TAVA Technologies, Inc.

March 00       Vice President, Atlantic Division, West Chester, PA; Nov 98 – Mar 00

Responsible for P&L management of the Atlantic Division of this instrument, electrical and control systems integrator.  Industries included refining, pharmaceutical, chemical and discrete manufacturing.  Position required management of 4 regional operations with a staff of approximately 200.  Management of Control System retrofit projects included scope definition, project management, instrumentation selection, electrical design, control system configuration and check-out and start-up.

 

                        Director of Operations, Western Region, Cypress, CA; Nov 97 – Oct 98

Responsible for P&L management of the Western Region.  Region included two branch offices (Los Angeles and Sacramento, California).  Focus was growth of systems integration and information systems business.  Projects were control system retrofit projects in the food, pharmaceutical and refining industries.

 

April  93-        Instrument Control Service, Inc.

Oct 97            Engineering Manager, Charleston, SC; Aug 94 – Oct 97

Responsible for the start-up and management of the Charleston Regional Engineering Group which oversaw EPC Instrumentation and Control System Retrofit projects.  The most financially successful engineering office start-up at ICS.  Projects included the Pulp and Paper and Chemical industries. Significant accomplishments included:

·Hired and managed over 25 permanent employees and 15 contract employees

·Provided management on projects, including scope definition, estimating, instrument selection, design engineering, control configuration, construction, check-out and start-up.  Construction projects included a paper machine retrofit, an electrical revamp of a batch chemical unit and the I&E construction of a new chemical and film production unit.

 

                        Instrument Control Service, Inc., Pensacola, FL

                        Project Manager and Technical Lead, April 93 – July 94

Responsibilities included serving as project manager including construction management, primary customer interface and technical lead for systems engineering projects.  Primary responsibility was overall EPC project management on a series of control system retrofits totaling $10 million.

 

June  89-       John Brown E & C Inc., Houston, TX

April 93          Process Control Engineer –

Primary responsibilities involved control systems integration and engineering, production optimization, instrumentation selection, field verification and plant start-up.  Major projects included the project lead and start-up of a batch polymer plant; construction management for a grass roots polypropylene facility with two series reactors; start-up and check-out of a grass roots MTBE facility; engineering, construction management and start-up engineering for an oil production facility; and project definition and instrument and control systems definition for an offshore platform retrofit.

 

April 87-         Rosemount, Inc., Burnsville, MN            

June 89         Project Manager- Control Systems Division

Served as the primary customer interface and project manager on over 40 distributed control system projects.  Responsibilities included project scope definition; schedule development; tracking; sizing; hardware layout; instrumentation specification; coordination of engineering, manufacturing and quality groups; configuration of control strategies and site checkout and startup.

 

Jan 86 -         The Core Team, Ankeny, IA

March 87       Process Control Engineer

Preparation of proposals, design and installation of control systems for vegetable oil processes.

 

Feb 85-          Mid Continent Resources, Carbondale, CO

Jan 86            Coal Miner

Coal mining activities in 2 underground coal mines including room and pillar, advancing and retreating long wall sections.

 

EDUCATION:

August  1980 -           Bachelor of Science

December 1984         Mining Engineering

Colorado School of Mines

 

September 2003 -      Institute for Managerial Leadership

May 2004                    McComb School of Business, University of Texas at Austin

 

REGISTRATION and CERTIFICATION:

Registered Professional Engineer

South Carolina, Texas

 

Project Management Professional (PMP)

Project Management Institute

 

INTELLECTUAL PROPERTY:

US Patent #6931125